Eaton 93PM UPS Installation Notes (part #1)

Covering three phase capacity ranges from 20kW all the way up to 400kW, the Eaton 93PM UPS is a great fit for many applications. This flexibility however means even if you’ve installed a 93PM previously, a different configuration might require a completely different wiring scheme and physical lineup. This post is the first of a multi-part series regarding Eaton 93PM UPS install notes that I have compiled in hopes to increase the efficiency of the installation process.

For Part #1 of this series I will address the major AC/DC termination points on a 208V configuration with the 3-breaker sidecar maintenance bypass as follows:

Continue reading “Eaton 93PM UPS Installation Notes (part #1)”

Can I temporarily remove UPS Batteries?

temporarily remove UPS batteries - UPS battery trays

Quite frequently, I get calls with clients asking “Can I temporarily remove UPS batteries from their pre-installed cabinets? These things are heavy!”. This is a frequent question that comes up because it’s not uncommon for Continue reading “Can I temporarily remove UPS Batteries?”

Welcome Post

Thanks for checking out nathanwhaley.blog

I created this site for two main reasons:

1. Provide a simple platform detailing the projects and services I help clients with.

2. Set a stage to discuss topics that hopefully interest others.

If you’d like to be added to my mailing list to receive notifications on new posts, please go to the “Contact” page and type “EMAIL LIST” in the first part of the description section.

-Nathan